Project Description

15-mile Electrical Transmission Rebuild Project

NES installed 1.5 miles of silt fence with a skid steer mounted silt fence plow to protect a waterway running parallel to the project area. Geotextile fabric and riprap were installed along the bank of the waterway where new electrical transmission poles were installed to prevent future erosion. Straw bale ditch checks, sediment stop and rock bag ditch checks along with inlet protectors for nearby storm drains were also utilized on this project.

Project Details

Location

Southern Wisconsin

Category

Erosion Control